The SG61000-5 fully automatic surge generator (also called lightning surge immunity test, combination wave generator, surge current generator/surge voltage generator, combined surge voltage and current generator) .
How does a surge generator work?
The SG61000-5 surge generator provides a common basis for evaluating the resistance of power cords and internal connectors of different equipment to high energy transient interference caused by natural lightning surge induction and large capacity load switching. It fully meets the IEC 61000-4-5, EN61000-4-5 and GB/T17626.5 standards.
Q1: The surge generator can’t be powered on. (The fuse or MOV burn out when the surge generator is turned on)
Fuse at the power filter:
MOV on the power filter inside of the surge generator:
A1: The power input of the surge generator is unstable, the voltage is too high or other power supply problems may cause the fuse and MOV to burn out. Please try to use a stable power supply.
Q2: During the surge test, the main power of the laboratory will trip.
A2: It is important to connect the isolation transformer to the “Internal CDN input” on the back of the surge generator according to the rated power of the EUT. Without an isolation transformer may easily cause the power grid to trip.
Q3: The EUT is not on when you click “EUT Power” on the touch screen.
A3: After completing all wiring, please confirm that the output of the isolation transformer is turned on before performing the surge test. Please confirm that the switch of the “Internal CDN input” on the back of the surge generator is turned on.
Q4: The synchronous phase angle is set. But the surge test is not carried out according to the corresponding angle.
A4: The EUT is powered by AC power, and the EUT needs to be turned on during testing so that the surge generator can detect the EUT power waveform and run surge test according to the set phase angle.
Q5: How to set the impedance for surge test?
A5: This surge generator is a fully automatic surge tester, and there is no need to set the impedance value yourself. When doing a line-to-line surge test, the impedance value automatically switches to 2Ω. When doing a line-to-ground surge test, the impedance value automatically switches to 12Ω. If your surge generator contains a 500Ω impedance output, you can also find the corresponding interface directly on the front panel.
Q6: Why is the peak voltage lower than the set surge voltage during surge test?
A6: If the EUT is not connected, the peak voltage is basically equal to the set surge voltage. However, if a EUT is connected, part of the surge voltage will be absorbed by the EUT. So the peak voltage will be lower than the set surge voltage.
Q7: Laboratory power supply tripped when run a surge test with coupling direction to PE.
A7: Please confirm that the ground wire of the surge generator is well connected to the earth:
Q8: How to use a discharge tube to confirm whether there is a surge output.
A8: If for some reason, the test is abnormal, and you want to confirm whether the surge generator still has a surge output normally, the best way is to refer to the manual and use an oscilloscope to accurately view the surge output waveform. If you don’t have an oscilloscope, you can also use a discharge tube to simply confirm whether the surge is still output.
The accessories include a discharge tube, as shown below. Customers can also purchase the discharge tube by themselves:
Simply connect the discharge tube to the surge generator as an EUT. During surge output, the discharge tube will light up. Otherwise, there is no surge output.
Q9: If the EUT is powered by DC, how to connect it?
A9: If the EUT is powered by DC, there is no need to use an isolation transformer, and the appropriate DC power supply can be directly connected to the L and N of the “Internal CDN Input” on the back of the instrument. Then the power cord of the EUT can be directly connected to L and N on the front panel of the instrument. Be careful not to connect the positive and negative poles of the front and rear connections incorrectly.
Lisun Instruments Limited was found by LISUN GROUP in 2003. LISUN quality system has been strictly certified by ISO9001:2015. As a CIE Membership, LISUN products are designed based on CIE, IEC and other international or national standards. All products passed CE certificate and authenticated by the third party lab.
Our main products are Goniophotometer, Integrating Sphere, Spectroradiometer, Surge Generator, ESD Simulator Guns, EMI Receiver, EMC Test Equipment, Electrical Safety Tester, Environmental Chamber, Temperature Chamber, Climate Chamber, Thermal Chamber, Salt Spray Test, Dust Test Chamber, Waterproof Test, RoHS Test (EDXRF), Glow Wire Test and Needle Flame Test.
Please feel free to contact us if you need any support.
Tech Dep: Service@Lisungroup.com, Cell/WhatsApp:+8615317907381
Sales Dep: Sales@Lisungroup.com, Cell/WhatsApp:+8618117273997
Your email address will not be published. Required fields are marked *