The IEC TS 62735-1:2015 standard specifies the technical requirements for direct current (DC) plug and socket-outlet systems designed for use with information and communication technology (ICT) equipment installed in data centres and telecom central offices. It focuses on a DC power system with a maximum capacity of 2.6 kW, providing guidance on design, safety, and performance criteria to ensure reliable and efficient power delivery in critical ICT environments.
LISUN supplies the fully test solutions for the following IEC TS 62735-1:2015, please see the below excel table:
IEC TS 62735-1:2015 Direct current (DC) plugs and socket-outlets for information and communication technology (ICT) equipment installed in data centres and telecom central offices – Part 1: Plug and socket-outlet system for 2.6 kW | LISUN MODEL |
Clause 10.2 Protection against electric shock | SMT-PB |
SMT-1150 | |
GW-500 | |
LS-B08 | |
Clause 10.3 Creepage Distance | CK-1 |
Clause 27 Creepage distances, clearances and distances through sealing compound | |
Clause 10.5-10.7 Gauge for checking non-accessibility of live parts, | SMT-20N |
SMT-1N | |
Clause 11.2 Resistant to corrosion | YWX/Q-010 |
Clause 12.2.10 corrosion | |
Clause 29 Resistance to rusting | |
Clause 11.4 Earthing Resistance | WB2678A |
Clause 12.2.5 torque test | LS-B47 |
Table 4 and Table 18 | |
Clause 12.2.5 damage to the conductor | WDT-1 |
Clause 12.2.6 Table 2 Pull test | LNSYJ-1 |
Clause 12.2.5 Insulation resistance measurement | JCY-2 |
Clause 12.3.12 deflecting stress | |
Clause 13.19 Heating Cabniet | GW-500 |
Clause 25 Resistance to heat | |
Clause 16.1 Resistance to ageing | GDJS-015B |
Clause 16.3 Resistance to humidity | |
Clause 17 Insulation resistance and electric strength | WB2681A |
Clause 19 Temperature rise | WS-1 |
Clause 22 Force necessary to withdraw the plug | BCL-1 |
Clause 23.2 The effectiveness of the retention of the cable(Figure 17) | LS-B07 |
Clause 23.4 Felxing test(Figure 18) | SW-6 |
Clause impact-test apparatus(Figure 19) | IK07-10VT |
Clause 24.5 Impact test in a freezer(Figure 20) | DWC-1 |